Product and electrical
Confirm applicable CE/EMC/LVD, RoHS, power, grounding, enclosure and ingress-protection documentation.
Compliance and safety
Required markings and safeguards depend on the exact product configuration, country, environment and intended use. This page separates review topics from approved certification evidence.

Compliance and safety
Required markings and safeguards depend on the exact product configuration, country, environment and intended use. This page separates review topics from approved certification evidence.
Confirm applicable CE/EMC/LVD, RoHS, power, grounding, enclosure and ingress-protection documentation.
Review dust, washdown, temperature, vibration, abrasion, food-contact proximity and hygienic-design requirements.
Assess hazardous-area classification, ATEX/IECEx needs, microwave frequency rules and permitted installation practices.
Document-to-equipment match
The useful question is not whether a logo or standard appears somewhere in a catalogue. The project must connect the required document to the exact hardware, destination, environment and installed condition.
Record model, hardware options, controller, serial or project reference and document revision.
List the country, required marking, power system and language before quotation and shipment.
Review dust, washdown, temperature, vibration, abrasion, food-contact proximity and hazardous-area status.
Keep grounding, guarding, cable entry, enclosure integrity and site modifications with the as-built file.

Exact configuration and destination
Compliance begins with the exact orderable configuration and intended installation—not with a general list of standards. Country of use, supply voltage, enclosure, cables, radio-frequency route, ambient limits, dust classification, product contact and cleaning method determine which documents and safeguards must be matched to the system.
Record country, indoor or outdoor use, electrical supply, environment, hazardous-area zone, hygiene boundary and intended operator interaction.
Verify model, option, enclosure and accessory identifiers against declarations, certificates, manuals and approved drawings.
Review grounding, isolation, guarding, cable protection, heat, dust, washdown, lifting and safe maintenance with the site team.
Keep the supplied documents, final drawings, risk assessment, inspection results and change history under one equipment identity.
Compliance file
Standards named on this page are review categories—not a declaration that every model already holds every approval.
Installation classification
Claims to verify
A document for a related model or component does not automatically cover the complete installed system.
Panels, frames, barriers and third-party wiring can introduce obligations outside the sensor enclosure.
Changing an antenna, power supply, housing, cable or installation practice can require a new compliance review.
Share a few process details and our application team will recommend a suitable technology, installation concept and validation plan.